I did some epoxy work this morning. Didn't take but an hour or so. I put a coat on the second side of the daggerboard and glued a piece of fiberglass to the bottom of the board.
I also glued the doublers on the bulkheads, put a second coat of epoxy on the inside of the trunk, and laminated the rudder blade. Here's a shot of the strongback/work table.
In the process one of the clamp handles came off. Hoping it's just a nut and bolt. I found what appears to be a nut on the floor.
Here's a shot of two doublers. Notice the 2 small holes. I used the technique of drilling a 1/8" hole through the pieces while clamped and before gluing and putting a dowel in the hole to assure proper alignment. Saves having to fiddle with an epoxy coated board and having any slippage. Works great.
No comments:
Post a Comment